How to Time Occupancy Studies for Seasonal Variation

How to Time Occupancy Studies for Seasonal Variation

how to time occupancy studies for seasonal variation: schedule studies so they cover a building's typical low and high seasons, avoid holiday and event weeks, and sample multiple non-consecutive weeks across the year to capture real variation.

how to time occupancy studies for seasonal variation?

Include at least one low-attendance week and one high-attendance week, plus one or two typical shoulder weeks spread across seasons to capture the building's range of demand. Use 12 months of badge attendance to identify peak, trough and median months, then pick weeks within those months while excluding holidays and major events.

Seasonal bias is common: a single-week study in January or August can understate year-round demand, while a mid-season week can miss peaks. Use historical badge exports to identify the months and specific weeks that reflect your operational questions before you commit field resources.

When Should I Schedule Studies To Capture Both Low And High Seasons?

Identify the site's historical trough months and peak months from at least 12 months of badge attendance, then pick weeks in those months while excluding known holidays, office closures and company events.

Steps to follow:
- Collect: Export daily badge counts for the previous 12 months, or longer if available. Aggregate to site-level person-days so weekend noise is obvious.
- Identify seasonal extremes: Find the three lowest and three highest months by median weekday attendance. If you have multiple years, check whether those months repeat.
- Exclude outliers: Remove weeks with public holidays, major company events, or known system outages. Those weeks should not represent typical seasonal demand.

Practical note: If your organisation had an unusual year (major policy change, pandemic-related shifts), treat that year cautiously. If you have two years, compare them and prefer patterns that are stable year-to-year.

How Many Weeks And Which Specific Weeks Should I Sample?

If resources allow, sample four weeks: one peak, one trough, and two typical weeks in different seasons; if constrained, prioritise one peak and one typical week. When deciding how many weeks to sample, return to your question: operational planning needs fewer, clearer comparisons; strategic capacity decisions need broader coverage.

Recommended sampling designs:
- Gold standard (four weeks): Peak month week, trough month week, one spring/shoulder week, one autumn/shoulder week. This captures both extremes and typical shoulder demand.
- Minimum (two weeks): One peak and one typical week if you must choose. Prefer non-consecutive weeks separated by at least six weeks so short-term events won't bias both samples.
- Compressed (single week with stratified days): Only when field access is extremely limited: select a week from a month that sits near the site's long-run median attendance, and sample every weekday, but understand this can miss real peaks or troughs.

Illustrative example: if badge data shows highest median weekdays in March and lowest in August, schedule one full study week in March, one in August, and two shoulder weeks (May and November). Label which week is peak/trough in your report.

Use daily badge counts to compute median weekday attendance by month, then map those months to candidate weeks while checking for holiday or one-off distortions.

A simple workflow:
1. Plot daily attendance for 12 months and add a 7-day median line to see weekday structure.
2. Calculate median weekday by month. This ignores weekend noise and gives a monthly typical value.
3. Flag months within ±5% of the 12-month median as candidate ‘typical’ months; flag the top 10–15% as peaks and bottom 10–15% as troughs.
4. Inspect daily patterns within candidate months to avoid weeks with anomalies (product launch, long local holiday).

What to watch for: Badge data can be noisy, a large one-day visit from external contractors can spike a daily count. Use medians and person-week summaries rather than single-day peaks when choosing weeks.

What Are The Common Mistakes That Introduce Seasonal Bias?

Common mistakes are sampling only during a single season, using holiday weeks, relying on a single day, and ignoring external events that distort attendance.

Common pitfalls and how to avoid them:
- Mistake: Running a study in the lowest-attendance month and generalising to the year. Fix: Include at least one higher-attendance week.
- Mistake: Treating a holiday-shortened week as typical. Fix: Exclude or separately label holiday weeks.
- Mistake: Selecting weeks around an internal event (all-hands, training). Fix: Check company calendars before confirming dates.
- Mistake: Assuming badge entries equal occupied desks. Fix: Use badge data to time studies, but pair field observations with booking or sensor data where you need desk-level utilisation.

How Long Should Each Study Day Or Week Run And Which Weekdays Matter Most?

Run full Monday-to-Friday observation weeks when possible; if you must reduce scope, ensure you capture at least two midweek days (Tuesday to Thursday) because they usually show highest and most typical office demand.

Reasons and trade-offs:
- Full week: Captures weekday-to-weekday variation, including quieter Mondays and Fridays.
- Midweek sampling only: Use when resources are limited; Tuesdays to Thursdays are usually most representative of core office demand.
- Number of days per week: More days reduce the risk that a single-day anomaly skews the result; aim for at least three weekdays if you cannot do five.

When Do I Need Repeated Or Longer Studies Instead Of Timing A Single Set Of Weeks?

Choose repeated or longer studies when your badge data shows large month-to-month swings, when policy changes are happening, or when you need robust estimates for financial or portfolio decisions.

Decision guide

  • Use repeated studies if seasonal variability exceeds your decision tolerance (for example, if peak demand is double trough demand and capacity decisions hinge on busy days).
  • Use a longer continuous study (multi-week or month-long) when occupancy patterns are unstable after policy changes, new transport links, or local office moves.
  • Use one-off timed weeks when the question is operational (catering, cleaning) and tolerance for error is higher.

What Should I Report To Stakeholders About Timing Choices?

Report which months you sampled, why you chose them, what you excluded (holidays/events), and how seasonal variation affects your conclusions.

Include these elements in a short methods note:
- What to do: State the months and exact week dates sampled, and the badge-based reason for choosing them.
- Success metric: Show median weekday attendance for sampled weeks and the 12-month range for context.
- Limitations: Note badge-data limitations and whether results reflect attendance rather than desk-level occupancy.

Tools such as BadgeIQ can make the initial month-by-month badge review quicker, but the interpretive decisions, which weeks best answer your operational question, are always a judgment call.

Next steps: Pull a 12-month badge export, mark peak and trough months, check the company calendar for conflicts, and pick your weeks using the four-week design where possible. That small upfront work prevents seasonal surprises and makes your study defensible to colleagues and auditors.

Fiona Fernandes

Fiona Fernandes

Workplace Insights Lead

Fiona is Workplace Insights Lead at BadgeIQ, where she writes about workplace attendance, hybrid working patterns, occupancy and the data behind better workplace decisions. Her focus is on making workplace analytics practical and understandable - helping teams distinguish what the data really shows from what it’s tempting to assume.